A yellow traffic sign

Downtown Event Closures

  • New: The south lane of Georgia Street between Illinois Street and Pennsylvania Street will be closed on Tuesday, July 15 from 8:00 a.m. through Monday, July 21 at 6:00 p.m.
  • New: Please be prepared for temporary closures surrounding Gainbridge Fieldhouse on July 18 and 19 for WNBA All-Star 2025.
  • New: Multiple closures will be in place on July 19 for the WNBA All-Star Community Bounce:
    • North Street between North Meridian Street and North Pennsylvania Street from 5:00 a.m. to 11:00 a.m.
    • North Meridian Street between St Clair Street and Monument Circle from 8:45 a.m. to 10:30 a.m.
  • New: Full closure of South Alley 150 West between Virginia Street and South Alley 100 is in effect for Indy Culture Festival on July 19 from 6:00 a.m. to 9:00 p.m.
  • New: Curb lane closures on Delaware Street and Alabama Street between the City-County Building Garage Exit and Washington Street are in effect for Sigma Gamma Rho’s Black Business Block Party on July 19 from 9:00 a.m. to 6:00 p.m.
  • New: Full closure of Massachusetts Avenue between North Street and Park Avenue is in effect for Mass Ave Summerfest Block Party on July 19 from 9:00 a.m. to 6:00 p.m.
  • Full closure of Monument Circle northwest quadrant is in effect for SPARK on the Circle:
    • This temporary closure will be in place through October 2 at 6:00 p.m.
    • Southbound traffic on Meridian Street from Ohio Street (North Spoke) will be closed throughout.
    • Westbound traffic on West Market Street (West Spoke) will be closed throughout.
  • The south half of Monument Circle will be closed on July 16 from 8:00 a.m. to 2:00 p.m. for the Original Farmers’ Market.
    • New: After the Original Farmers’ Market, the south half of Monument Circle will remain closed through Sunday, July 20 at 5:00 p.m. for WNBA All-Star activations.
    • This is a recurring event every Wednesday that will conclude on September 24.

 

 

Local Street Closures

  • Intermittent closures are anticipated along West Street for resurfacing work through the end of August.
  • There is a full closure of Illinois Street between South Street and Georgia Street.
    • There will be one lane open on Illinois Street until further notice to allow for the relocation of utility lines required ahead of the Signia by Hilton construction.
    • The detour will route cars to circle in a loop south on Capitol Avenue and north on Meridian Street.
    • Cross streets at South Street is open.
    • There will be a full closure of Georgia Street between Illinois Street and Capitol Avenue until further notice.
    • There will be a partial closure of Capitol Avenue in the two eastern most lanes between Illinois Street and Capitol Avenue until further notice .
  • Multiple partial closures are in place until further notice for The Shinola Hotel construction:
    • Georgia Street south lane between Scioto Street and Pennsylvania Street.
    • Scioto Street between Louisiana Street and Georgia Street.
    • Easternmost Pennsylvania Street southbound lane between Georgia Street and South Street.
    • The project is anticipated to take 35 months until completion

 


North Split Updates

  • Crews will be working around the clock on local streets throughout the North Split project area until further notice. Click here for updates and details on traffic redirection.

 


Indiana University Health Closures

  • Closures for new hospital construction for the week of July 14:
    • A single lane closure along the west side of Capitol Avenue between 15th Street and 13th Street.
  • Closures for construction activities until further notice:
    • Total closure of Senate Avenue between 12th Street and 16th Street.
  • Closures for Central Utility Plant construction until further notice:
    • Total closure of 13th Street between Senate Avenue and just west of the Starbucks entrance.
    • Intermittent lane impacts along 12th Street between Senate Avenue and Capitol Avenue due to material deliveries.
  • Closure for South Support Building construction until further notice:
    • Partial closure of Capitol Avenue between 13th Street and 14th Street.
    • Total closure of 14th Street between Capitol Avenue and Byram Place, with the exception of construction traffic.
  • Closures for pedestrian trail construction until further notice:
    • Partial closure of Senate Boulevard eastern-most northbound lane between 21st Street and 16th street for trail construction.
  • Click here for updates and details on traffic redirection.

 

Blue Line Construction

  • Partial closures will be in place along Washington Street between North White River Parkway and Belmont Avenue for Blue Line construction:
    • Full closure of westbound lanes
    • Detour routes available using North White River Parkway, Michigan Street and Holt Road
    • This temporary closure will be in place for six months.
  • Impact of closures on IndyGo’s Route 8:
    • All westbound bus stops along Washington Street between North White River Parkway and Belmont Avenue will be closed.
    • Routes will also detour using North White River Parkway, Michigan Street and Holt Road.
    • Temporary stops will be implemented near the intersection of Washington Street and North White River Parkway and the intersection of Washington Street and Belmont Avenue.
  • During the six-month closure of West Washington Street, the intersection of Washington Street and Harding Street will close for approximately two months:
    • Only eastbound traffic will be allowed through the intersection during this phase.
    • Northbound traffic will detour using Oliver and Belmont avenues and Washington Street.
    • Southbound traffic will use Washington and West streets and Kentucky and Oliver avenues.
    • Southbound trucks will follow Washington Street to West Street, then use I-70 to return to Harding Street.